REKAP BANTUAN DANA LINGKUNGAN (BDL) TINGKAT DESA / KELURAHAN
| Jenis Infrastruktur | Volume | Biaya | Status Selesai |
| Kota : BANTUL | |||
| Kecamatan : BAMBANG LIPURO | |||
| Desa / Kelurahan : SIDOMULYO | |||
| 1. Jalan - Cor Beton/Blok | 494.00 | 200,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : BANGUNTAPAN | |||
| Desa / Kelurahan : JAGALAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 2.00 | 48,000,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 553.00 | 36,000,000.00 | Ya |
| 4. Jalan - Paving Blok | 220.00 | 10,000,000.00 | Ya |
| 5. Sumur Resapan, SPAH | 50.00 | 50,000,000.00 | Ya |
| Total | 150,000,000.00 | ||
| Desa / Kelurahan : JAMBIDAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Talud | 607.00 | 166,000,000.00 | Ya |
| Total | 172,000,000.00 | ||
| Desa / Kelurahan : WIROKERTEN | |||
| 1. Jembatan | 1.00 | 136,000,000.00 | Tidak |
| Total | 136,000,000.00 | ||
| Kecamatan : BANTUL | |||
| Desa / Kelurahan : RINGIN HARJO | |||
| 1. Gorong-Gorong | 32.00 | 10,250,000.00 | Ya |
| 2. Jalan | 875.00 | 43,750,000.00 | Ya |
| 3. Talud | 100.00 | 14,000,000.00 | Ya |
| Total | 68,000,000.00 | ||
| Desa / Kelurahan : SABDODADI | |||
| 1. Dam/Bendungan | 54.00 | 40,000,000.00 | Ya |
| 2. Jalan | 260.00 | 38,000,000.00 | Ya |
| 3. Talud | 200.00 | 22,000,000.00 | Ya |
| Total | 100,000,000.00 | ||
| Desa / Kelurahan : TRIRENGGO | |||
| 1. Drainase, Selokan, SAH, SAL | 220.50 | 61,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 112.50 | 49,000,000.00 | Ya |
| 3. Talud | 36.75 | 10,000,000.00 | Ya |
| Total | 120,000,000.00 | ||
| Kecamatan : IMOGIRI | |||
| Desa / Kelurahan : IMOGIRI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 12.00 | 2,004,000.00 | Ya |
| 3. Jalan | 476.00 | 51,354,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 1,500.00 | 50,250,000.00 | Ya |
| 5. Sanitasi, MCK | 18.00 | 2,004,000.00 | Ya |
| 6. Talud | 120.00 | 4,380,000.00 | Ya |
| 7. Tutup Saluran | 48.00 | 4,008,000.00 | Ya |
| Total | 120,000,000.00 | ||
| Desa / Kelurahan : SRIHARJO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 2,000.00 | 116,400,000.00 | Ya |
| 3. Sanitasi, MCK | 7.00 | 47,600,000.00 | Ya |
| Total | 170,000,000.00 | ||
| Kecamatan : JETIS | |||
| Desa / Kelurahan : CANDEN | |||
| 1. BOP | 1.00 | 4,932,500.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 185.00 | 18,739,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 1,954.60 | 67,029,000.00 | Ya |
| 4. Other | 6.00 | 6,060,000.00 | Ya |
| 5. Talud | 980.00 | 79,239,500.00 | Ya |
| Total | 176,000,000.00 | ||
| Desa / Kelurahan : SUMBER AGUNG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 49.00 | 14,000,000.00 | Ya |
| Total | 20,000,000.00 | ||
| Desa / Kelurahan : TRIMULYO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 3,200.00 | 114,000,000.00 | Ya |
| Total | 120,000,000.00 | ||
| Kecamatan : KASIHAN | |||
| Desa / Kelurahan : BANGUNJIWO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 2,193.00 | 153,525,000.00 | Ya |
| 3. Jembatan | 1.00 | 22,675,000.00 | Ya |
| 4. Sanitasi, MCK | 1.00 | 17,800,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : NGESTIHARJO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 875.00 | 159,000,000.00 | Ya |
| 3. Sanitasi, MCK | 5.00 | 20,000,000.00 | Ya |
| 4. Talud | 85.00 | 15,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : TAMANTIRTO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 1,775.00 | 49,500,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 3,946.00 | 104,500,000.00 | Ya |
| Total | 160,000,000.00 | ||
| Kecamatan : KRETEK | |||
| Desa / Kelurahan : DONOTIRTO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 50.00 | 3,750,000.00 | Ya |
| 3. Gorong-Gorong | 9.00 | 2,980,000.00 | Ya |
| 4. Jalan | 709.00 | 158,245,000.00 | Ya |
| 5. Talud | 75.00 | 25,025,000.00 | Ya |
| Total | 196,000,000.00 | ||
| Kecamatan : PANDAK | |||
| Desa / Kelurahan : GILANGHARJO | |||
| 1. Jalan - Cor Beton/Blok | 5,606.00 | 114,700,000.00 | Ya |
| 2. Sanitasi, MCK | 10.00 | 25,000,000.00 | Ya |
| 3. Talud | 5,606.00 | 10,300,000.00 | Ya |
| Total | 150,000,000.00 | ||
| Desa / Kelurahan : WIJIREJO | |||
| 1. Jalan - Cor Beton/Blok | 4,219.00 | 81,000,000.00 | Ya |
| 2. Jalan - Makadam | 600.00 | 13,400,000.00 | Ya |
| 3. Pasar, Fasilitas Perdagangan | 1.00 | 60,000,000.00 | Ya |
| 4. Puskesmas, Posyandu, Fasilitas Kesehatan | 2.00 | 28,000,000.00 | Ya |
| 5. Talud | 150.00 | 13,400,000.00 | Ya |
| Total | 195,800,000.00 | ||
| Kecamatan : PIYUNGAN | |||
| Desa / Kelurahan : SITIMULYO | |||
| 1. Balai Pertemuan | 850.00 | 30,000,000.00 | Ya |
| 2. BOP | 1.00 | 6,000,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 500.00 | 46,800,000.00 | Ya |
| 4. Gorong-Gorong | 4.50 | 4,000,000.00 | Ya |
| 5. Jalan | 1,622.00 | 78,600,000.00 | Ya |
| 6. Talud | 52.50 | 14,600,000.00 | Ya |
| Total | 180,000,000.00 | ||
| Desa / Kelurahan : SRIMARTANI | |||
| 1. Air Bersih, Reservoar, Broncapturing | 1,200.00 | 9,895,000.00 | Ya |
| 2. Balai Pertemuan | 1.00 | 9,605,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 750.00 | 20,250,000.00 | Ya |
| 4. Drainase, Selokan, SAH, SAL | 300.00 | 10,500,000.00 | Ya |
| 5. Jalan | 300.00 | 10,875,000.00 | Ya |
| 6. Jalan | 300.00 | 10,875,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 100.00 | 5,800,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 500.00 | 14,000,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 400.00 | 11,200,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 400.00 | 11,200,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 600.00 | 13,800,000.00 | Ya |
| 12. Talud | 250.00 | 9,000,000.00 | Ya |
| 13. Talud | 250.00 | 9,000,000.00 | Ya |
| 14. Talud | 200.00 | 9,000,000.00 | Ya |
| 15. Talud | 700.00 | 16,200,000.00 | Ya |
| 16. Talud | 500.00 | 18,000,000.00 | Ya |
| 17. Talud | 300.00 | 10,800,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : SRIMULYO | |||
| 1. Balai Pertemuan | 1.00 | 12,800,000.00 | Ya |
| 2. Gorong-Gorong | 10.00 | 6,000,000.00 | Ya |
| 3. Irigasi | 50.00 | 14,800,000.00 | Ya |
| 4. Jalan | 300.00 | 7,000,000.00 | Ya |
| 5. Jalan | 200.00 | 4,000,000.00 | Ya |
| 6. Jalan | 300.00 | 8,000,000.00 | Ya |
| 7. Jalan | 500.00 | 12,800,000.00 | Ya |
| 8. Jalan | 100.00 | 6,000,000.00 | Ya |
| 9. Jalan | 100.00 | 12,800,000.00 | Ya |
| 10. Jalan | 300.00 | 6,000,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 100.00 | 12,800,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 100.00 | 12,800,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 100.00 | 12,800,000.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 100.00 | 6,000,000.00 | Ya |
| 15. Jalan - Cor Beton/Blok | 100.00 | 7,000,000.00 | Ya |
| 16. Jalan - Cor Beton/Blok | 100.00 | 12,800,000.00 | Ya |
| 17. Jembatan | 1.00 | 6,000,000.00 | Ya |
| 18. Sanitasi, MCK | 2.00 | 6,000,000.00 | Ya |
| 19. Talud | 25.00 | 6,000,000.00 | Ya |
| 20. Talud | 25.00 | 12,800,000.00 | Ya |
| 21. Talud | 25.00 | 7,800,000.00 | Ya |
| 22. Talud | 25.00 | 7,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : PUNDONG | |||
| Desa / Kelurahan : SELOHARJO | |||
| 1. Air Bersih, Reservoar, Broncapturing | 500.00 | 10,500,000.00 | Ya |
| 2. Dam/Bendungan | 1.00 | 10,750,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 48.00 | 10,576,880.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 286.00 | 95,508,400.00 | Ya |
| 5. Jembatan | 1.00 | 10,140,000.00 | Ya |
| 6. Sanitasi, MCK | 1.00 | 9,090,000.00 | Ya |
| 7. Talud | 130.00 | 21,434,720.00 | Ya |
| Total | 168,000,000.00 | ||
| Desa / Kelurahan : SRIHARDONO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 1,600.00 | 36,000,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 5,600.00 | 140,000,000.00 | Ya |
| 4. Jalan - Makadam | 800.00 | 8,000,000.00 | Ya |
| 5. Jalan - Paving Blok | 2,000.00 | 10,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : SANDEN | |||
| Desa / Kelurahan : GADINGSARI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 580.00 | 130,480,000.00 | Ya |
| 3. Jembatan | 1.00 | 10,525,000.00 | Ya |
| 4. Talud | 550.00 | 38,995,000.00 | Ya |
| Total | 186,000,000.00 | ||
| Desa / Kelurahan : MURTIGADING | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 120.00 | 23,762,000.00 | Ya |
| 3. Jalan | 370.00 | 83,510,695.00 | Ya |
| 4. Sanitasi, MCK | 1.00 | 3,101,000.00 | Ya |
| 5. Talud | 107.00 | 73,626,305.00 | Ya |
| Total | 190,000,000.00 | ||
| Desa / Kelurahan : SRIGADING | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 446.00 | 27,600,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 649.00 | 147,000,000.00 | Ya |
| 4. Talud | 113.00 | 19,400,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : SEDAYU | |||
| Desa / Kelurahan : ARGOREJO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 72.00 | 20,168,200.00 | Ya |
| 3. Gorong-Gorong | 2.00 | 462,600.00 | Ya |
| 4. Jalan | 1,771.00 | 35,554,200.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 206.00 | 104,586,600.00 | Ya |
| 6. Talud | 131.00 | 33,228,400.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : SEWON | |||
| Desa / Kelurahan : BANGUNHARJO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Dam/Bendungan | 140.00 | 28,000,000.00 | Ya |
| 3. Jalan | 7,375.00 | 89,000,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 2,625.00 | 22,000,000.00 | Ya |
| 5. Talud | 307.00 | 11,000,000.00 | Ya |
| Total | 156,000,000.00 | ||
| Desa / Kelurahan : PANGGUNGHARJO | |||
| 1. Irigasi | 1,600.00 | 60,000,000.00 | Ya |
| 2. Jalan | 9,000.00 | 100,000,000.00 | Ya |
| 3. Jembatan | 1.00 | 20,000,000.00 | Ya |
| Total | 180,000,000.00 | ||
| Kecamatan : SRANDAKAN | |||
| Desa / Kelurahan : PONCOSARI | |||
| 1. BOP | 1.00 | 5,813,950.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 265.00 | 152,098,150.00 | Ya |
| 3. Talud | 25.00 | 12,087,900.00 | Ya |
| Total | 170,000,000.00 | ||
| Desa / Kelurahan : TRIMURTI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 265.00 | 21,451,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 889.00 | 155,882,000.00 | Ya |
| 4. Sanitasi, MCK | 2.00 | 16,667,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kota : GUNUNG KIDUL | |||
| Kecamatan : GEDANG SARI | |||
| Desa / Kelurahan : HARGO MULYO | |||
| 1. Air Bersih, Reservoar, Broncapturing | 12.00 | 64,100,000.00 | Ya |
| 2. Balai Pertemuan | 1.00 | 60,000,000.00 | Ya |
| 3. BOP | 1.00 | 6,000,000.00 | Ya |
| 4. Gorong-Gorong | 4.00 | 2,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 50.00 | 5,000,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 100.00 | 7,500,000.00 | Ya |
| 7. Jembatan | 1.00 | 2,100,000.00 | Ya |
| 8. Jembatan | 1.00 | 4,000,000.00 | Ya |
| 9. Jembatan | 1.00 | 3,500,000.00 | Ya |
| 10. Sanitasi, MCK | 2.00 | 44,300,000.00 | Ya |
| 11. Talud | 5.00 | 1,500,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : NGALANG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 112.00 | 13,208,500.00 | Ya |
| 3. Talud | 448.00 | 180,791,500.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : NGLIPAR | |||
| Desa / Kelurahan : NGLIPAR | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 5.00 | 4,000,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 384.00 | 158,000,000.00 | Ya |
| 4. Sanitasi, MCK | 24.00 | 12,000,000.00 | Ya |
| 5. Talud | 80.00 | 20,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : PALIYAN | |||
| Desa / Kelurahan : KARANG ASEM | |||
| 1. Jalan | 1.00 | 29,800,000.00 | Ya |
| 2. Jalan | 1.00 | 23,812,000.00 | Ya |
| 3. Jembatan | 1.00 | 146,388,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KARANG DUWET | |||
| 1. Drainase, Selokan, SAH, SAL | 800.00 | 53,772,500.00 | Ya |
| 2. Jalan | 900.00 | 19,270,000.00 | Ya |
| 3. Jalan | 400.00 | 19,082,500.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 1,345.00 | 107,875,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : PANGGANG | |||
| Desa / Kelurahan : GIRIHARJO | |||
| 1. Air Bersih, Reservoar, Broncapturing | 3.00 | 15,000,000.00 | Ya |
| 2. BOP | 1.00 | 6,000,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 650.00 | 25,000,000.00 | Ya |
| 4. Gorong-Gorong | 46.00 | 49,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 200.00 | 15,000,000.00 | Ya |
| 6. Other | 1.00 | 90,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : SAPTO SARI | |||
| Desa / Kelurahan : KEPEK | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 359.00 | 37,400,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 1,650.00 | 156,600,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kota : KLATEN | |||
| Kecamatan : CEPER | |||
| Desa / Kelurahan : CETAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 320.00 | 37,000,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 152.00 | 20,000,000.00 | Ya |
| 4. Jalan | 1,360.00 | 30,000,000.00 | Ya |
| 5. Jalan | 1,150.00 | 30,000,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 1,260.00 | 30,000,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 1,050.00 | 33,000,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 318.00 | 10,000,000.00 | Ya |
| Total | 196,000,000.00 | ||
| Desa / Kelurahan : DLIMAS | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 75.00 | 5,827,000.00 | Ya |
| 3. Gorong-Gorong | 14.00 | 35,302,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 210.00 | 6,777,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 375.00 | 12,102,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 180.00 | 5,809,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 391.00 | 12,594,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 300.00 | 9,682,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 150.00 | 4,841,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 300.00 | 9,682,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 175.00 | 5,647,000.00 | Ya |
| 12. Sanitasi, MCK | 1.00 | 11,548,000.00 | Ya |
| 13. Talud | 41.00 | 11,606,000.00 | Ya |
| 14. Talud | 57.00 | 16,940,000.00 | Ya |
| 15. Talud | 116.00 | 32,554,000.00 | Ya |
| 16. Talud | 32.00 | 8,857,000.00 | Ya |
| 17. Talud | 15.00 | 4,232,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : JAMBU KIDUL | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 400.00 | 15,000,000.00 | Ya |
| 3. Jalan | 1,200.00 | 24,000,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 1,050.00 | 15,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 1,050.00 | 15,000,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 1,137.50 | 19,000,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 1,050.00 | 15,000,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 1,050.00 | 15,000,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 1,102.50 | 17,000,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 1,300.00 | 21,000,000.00 | Ya |
| 11. Talud | 78.75 | 17,000,000.00 | Ya |
| 12. Talud | 87.50 | 13,000,000.00 | Ya |
| Total | 192,000,000.00 | ||
| Desa / Kelurahan : KAJEN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 735.00 | 9,880,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 1,480.00 | 124,968,000.00 | Ya |
| 4. Sanitasi, MCK | 1.00 | 1,650,000.00 | Ya |
| 5. Talud | 718.05 | 53,502,000.00 | Ya |
| Total | 196,000,000.00 | ||
| Desa / Kelurahan : KUNCEN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 900.00 | 35,867,000.00 | Ya |
| 3. Jalan | 1,400.00 | 42,363,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 225.00 | 6,637,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 1,230.00 | 36,283,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 300.00 | 8,849,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 450.00 | 13,274,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 390.00 | 10,619,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 350.00 | 10,324,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 360.00 | 11,504,000.00 | Ya |
| 11. Talud | 130.00 | 18,280,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : MEGER | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 18.00 | 53,307,500.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 31.25 | 11,380,500.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 795.00 | 11,714,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 412.50 | 29,042,000.00 | Ya |
| 6. Jembatan | 1.00 | 12,647,000.00 | Ya |
| 7. Jembatan | 1.00 | 14,754,500.00 | Ya |
| 8. Jembatan | 1.00 | 12,708,900.00 | Ya |
| 9. Talud | 84.80 | 25,520,400.00 | Ya |
| 10. Talud | 61.50 | 16,537,200.00 | Ya |
| 11. Talud | 21.00 | 6,388,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : PASUNGAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 100.00 | 6,531,000.00 | Ya |
| 3. Jalan | 15.96 | 17,398,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 874.00 | 25,588,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 750.00 | 17,546,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 500.00 | 14,617,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 375.00 | 8,806,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 360.00 | 11,405,000.00 | Ya |
| 9. Jembatan | 1.00 | 8,235,000.00 | Ya |
| 10. Talud | 183.75 | 42,074,000.00 | Ya |
| 11. Talud | 48.75 | 9,693,000.00 | Ya |
| 12. Talud | 70.00 | 10,766,000.00 | Ya |
| 13. Talud | 19.50 | 8,077,000.00 | Ya |
| 14. Talud | 42.41 | 6,632,000.00 | Ya |
| 15. Talud | 19.50 | 6,632,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : POKAK | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 594.33 | 19,181,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 300.00 | 9,682,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 825.00 | 26,626,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 675.00 | 21,784,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 675.00 | 21,784,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 750.00 | 24,205,000.00 | Ya |
| 8. Talud | 10.00 | 3,533,000.00 | Ya |
| 9. Talud | 150.00 | 14,401,000.00 | Ya |
| 10. Talud | 155.00 | 24,002,000.00 | Ya |
| 11. Talud | 130.00 | 28,802,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : SREBEGAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 500.00 | 15,533,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 375.00 | 12,102,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 412.50 | 13,313,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 250.00 | 8,068,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 375.00 | 12,102,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 426.00 | 13,748,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 250.00 | 8,068,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 155.00 | 5,002,000.00 | Ya |
| 10. Talud | 200.00 | 13,218,000.00 | Ya |
| 11. Talud | 150.00 | 10,244,000.00 | Ya |
| 12. Talud | 77.55 | 22,140,000.00 | Ya |
| 13. Talud | 165.00 | 11,235,000.00 | Ya |
| 14. Talud | 150.00 | 5,948,000.00 | Ya |
| 15. Talud | 18.52 | 10,147,000.00 | Ya |
| 16. Talud | 100.00 | 16,523,000.00 | Ya |
| 17. Talud | 100.00 | 6,609,000.00 | Ya |
| Total | 190,000,000.00 | ||
| Kecamatan : GANTIWARNO | |||
| Desa / Kelurahan : BATURAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 5,880.00 | 188,000,000.00 | Ya |
| Total | 194,000,000.00 | ||
| Desa / Kelurahan : CEPORAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 347.00 | 46,700,000.00 | Ya |
| 3. Sumur Suntik | 300.00 | 131,300,000.00 | Ya |
| Total | 184,000,000.00 | ||
| Desa / Kelurahan : GENTAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 3,790.50 | 122,334,000.00 | Ya |
| 3. Jalan - Makadam | 120.00 | 3,414,000.00 | Ya |
| 4. Talud | 244.00 | 68,252,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : GESIKAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Talud | 1,000.00 | 194,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : JABUNG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 38.00 | 1,900,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 125.00 | 5,185,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 130.00 | 3,500,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 738.00 | 27,787,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 150.00 | 3,100,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 620.00 | 20,009,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 150.00 | 4,500,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 336.00 | 10,844,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 374.50 | 14,216,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 600.00 | 19,364,000.00 | Ya |
| 12. Jalan - Paving Blok | 636.00 | 30,395,000.00 | Ya |
| 13. Talud | 38.00 | 8,200,000.00 | Ya |
| 14. Talud | 60.00 | 7,000,000.00 | Ya |
| Total | 162,000,000.00 | ||
| Desa / Kelurahan : KARANGTURI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 720.00 | 92,909,000.00 | Ya |
| 3. Jalan - Makadam | 720.00 | 56,148,000.00 | Ya |
| 4. Talud | 183.00 | 16,353,000.00 | Ya |
| 5. Talud | 500.00 | 28,590,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KATEKAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Box/Plat Decker | 1.00 | 10,000,000.00 | Ya |
| 3. Box/Plat Decker | 1.00 | 10,000,000.00 | Ya |
| 4. Jalan | 3,200.00 | 80,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 480.00 | 12,790,000.00 | Ya |
| 6. Jembatan | 1.00 | 5,000,000.00 | Ya |
| 7. Talud | 330.00 | 76,210,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KERTEN | |||
| 1. BOP | 1.00 | 714,500.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 150.00 | 15,930,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 11.00 | 1,407,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 186.00 | 16,387,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 275.00 | 23,190,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 67.00 | 6,728,500.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 227.00 | 24,798,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 200.00 | 18,727,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 293.00 | 24,651,500.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 67.00 | 6,092,500.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 275.00 | 25,939,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 190.00 | 20,234,000.00 | Ya |
| 13. Talud | 40.00 | 5,251,000.00 | Ya |
| 14. Talud | 15.00 | 5,158,000.00 | Ya |
| 15. Talud | 18.00 | 4,792,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KRAGILAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 300.00 | 20,000,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 700.00 | 52,000,000.00 | Ya |
| 4. Jembatan | 2.00 | 44,000,000.00 | Ya |
| 5. Talud | 550.00 | 40,000,000.00 | Ya |
| Total | 162,000,000.00 | ||
| Desa / Kelurahan : MLESE | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 6.00 | 2,600,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 1,000.00 | 32,600,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 600.00 | 19,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 437.50 | 14,000,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 765.00 | 19,000,000.00 | Ya |
| 7. Jalan - Paving Blok | 540.00 | 36,800,000.00 | Ya |
| 8. Talud | 280.00 | 28,000,000.00 | Ya |
| 9. Talud | 75.00 | 9,000,000.00 | Ya |
| 10. Talud | 175.00 | 17,000,000.00 | Ya |
| Total | 184,000,000.00 | ||
| Desa / Kelurahan : MURUH | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 172.00 | 16,026,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 200.00 | 18,383,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 196.00 | 17,838,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 265.00 | 23,878,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 300.00 | 27,147,000.00 | Ya |
| 7. Talud | 37.00 | 5,276,000.00 | Ya |
| 8. Talud | 184.00 | 25,246,000.00 | Ya |
| 9. Talud | 85.00 | 11,762,000.00 | Ya |
| 10. Talud | 100.00 | 13,922,000.00 | Ya |
| 11. Talud | 100.00 | 13,896,000.00 | Ya |
| 12. Talud | 150.00 | 20,626,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : MUTIHAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 60.00 | 11,500,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 3,500.00 | 137,000,000.00 | Ya |
| 4. Talud | 60.00 | 3,500,000.00 | Ya |
| Total | 158,000,000.00 | ||
| Desa / Kelurahan : SAWIT | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 861.70 | 64,000,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 480.80 | 35,708,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 300.00 | 22,280,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 494.50 | 36,724,000.00 | Ya |
| 6. Jembatan | 4.00 | 19,488,000.00 | Ya |
| 7. Talud | 102.00 | 15,800,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : JOGONALAN | |||
| Desa / Kelurahan : BAKUNG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 2,350.00 | 104,525,000.00 | Ya |
| 3. Jalan | 420.00 | 18,880,000.00 | Ya |
| 4. Talud | 238.00 | 70,595,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : DOMPYONGAN | |||
| 1. BOP | 1.00 | 5,940,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 600.00 | 12,102,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 600.00 | 19,364,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 375.00 | 19,364,000.00 | Ya |
| 5. Jalan - Makadam | 330.00 | 8,842,000.00 | Ya |
| 6. Jalan - Makadam | 600.00 | 15,882,000.00 | Ya |
| 7. Talud | 19.88 | 29,344,000.00 | Ya |
| 8. Talud | 69.94 | 36,209,000.00 | Ya |
| 9. Talud | 21.11 | 29,611,000.00 | Ya |
| 10. Talud | 6.94 | 23,342,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : GONDANGAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 1,080.00 | 52,500,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 1,116.00 | 29,067,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 150.00 | 5,388,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 702.00 | 23,070,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 651.00 | 21,021,000.00 | Ya |
| 7. Talud | 26.45 | 5,252,000.00 | Ya |
| 8. Talud | 21.74 | 3,947,000.00 | Ya |
| 9. Talud | 50.11 | 9,755,000.00 | Ya |
| Total | 156,000,000.00 | ||
| Desa / Kelurahan : JOTON | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 200.00 | 5,878,400.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 120.00 | 7,130,500.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 187.00 | 6,690,600.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 3,480.00 | 92,300,500.00 | Ya |
| Total | 118,000,000.00 | ||
| Desa / Kelurahan : KARANGDUKUH | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 2,045.00 | 75,924,000.00 | Ya |
| 3. Talud | 164.00 | 37,388,000.00 | Ya |
| 4. Talud | 324.00 | 80,688,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KRAGUMAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 945.00 | 103,600,000.00 | Ya |
| 3. Jalan | 630.00 | 20,000,000.00 | Ya |
| 4. Jalan | 1,260.00 | 12,110,000.00 | Ya |
| 5. Jalan - Paving Blok | 2,875.00 | 58,290,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : NGERING | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 1,040.00 | 30,014,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 600.00 | 19,364,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 880.00 | 28,320,000.00 | Ya |
| 5. Talud | 43.40 | 12,909,000.00 | Ya |
| 6. Talud | 364.00 | 103,393,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : PAKAHAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 849.00 | 36,316,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 307.50 | 9,316,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 466.80 | 14,143,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 130.00 | 3,938,500.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 536.90 | 16,266,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 390.00 | 11,816,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 427.50 | 12,952,000.00 | Ya |
| Total | 110,747,500.00 | ||
| Desa / Kelurahan : PLAWIKAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 150.00 | 17,900,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 300.00 | 21,876,000.00 | Ya |
| 4. Drainase, Selokan, SAH, SAL | 400.00 | 25,112,000.00 | Ya |
| 5. Drainase, Selokan, SAH, SAL | 100.00 | 8,484,000.00 | Ya |
| 6. Drainase, Selokan, SAH, SAL | 150.00 | 13,443,000.00 | Ya |
| 7. Drainase, Selokan, SAH, SAL | 150.00 | 14,000,000.00 | Ya |
| 8. Drainase, Selokan, SAH, SAL | 179.00 | 8,902,000.00 | Ya |
| 9. Jalan | 350.00 | 11,668,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 200.00 | 21,070,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 150.00 | 8,539,000.00 | Ya |
| 12. Talud | 400.00 | 26,045,000.00 | Ya |
| 13. Talud | 87.00 | 12,961,000.00 | Ya |
| Total | 196,000,000.00 | ||
| Desa / Kelurahan : PRAWATAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 450.00 | 25,000,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 700.00 | 5,000,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 364.00 | 4,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 210.00 | 6,777,120.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 350.00 | 9,000,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 200.00 | 6,454,400.00 | Ya |
| 8. Jembatan | 1.00 | 8,500,000.00 | Ya |
| 9. Talud | 35.90 | 4,000,000.00 | Ya |
| 10. Talud | 15.00 | 2,222,880.00 | Ya |
| 11. Talud | 18.00 | 2,045,600.00 | Ya |
| 12. Talud | 39.20 | 9,000,000.00 | Ya |
| 13. Talud | 19.80 | 4,000,000.00 | Ya |
| Total | 92,000,000.00 | ||
| Desa / Kelurahan : REJOSO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 2,200.00 | 84,360,000.00 | Ya |
| 3. Talud | 533.00 | 107,640,000.00 | Ya |
| Total | 198,000,000.00 | ||
| Desa / Kelurahan : SOMOPURO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 22.30 | 16,000,000.00 | Ya |
| 3. Jalan | 110.50 | 19,000,000.00 | Ya |
| 4. Jalan | 58.50 | 18,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 60.20 | 15,000,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 75.00 | 16,000,000.00 | Ya |
| 7. Jalan - Paving Blok | 66.90 | 16,500,000.00 | Ya |
| 8. Jalan - Paving Blok | 80.30 | 19,000,000.00 | Ya |
| 9. Talud | 131.50 | 19,000,000.00 | Ya |
| 10. Talud | 111.12 | 19,000,000.00 | Ya |
| 11. Talud | 175.35 | 18,500,000.00 | Ya |
| Total | 182,000,000.00 | ||
| Desa / Kelurahan : SUMYANG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 21.00 | 13,072,900.00 | Ya |
| 3. Jalan | 575.00 | 30,962,100.00 | Ya |
| 4. Jalan | 1,050.00 | 54,012,200.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 754.00 | 27,546,200.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 540.00 | 25,449,600.00 | Ya |
| 7. Talud | 168.00 | 25,345,000.00 | Ya |
| 8. Talud | 160.85 | 17,612,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : TAMBAKAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 600.00 | 15,231,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 50.00 | 14,393,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 600.00 | 16,793,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 50.00 | 12,761,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 750.00 | 17,136,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 450.00 | 13,464,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 600.00 | 17,683,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 300.00 | 9,133,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 450.00 | 14,225,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 300.00 | 12,090,500.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 600.00 | 14,794,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 300.00 | 8,911,000.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 750.00 | 17,927,500.00 | Ya |
| 15. Jalan - Cor Beton/Blok | 300.00 | 9,458,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : TANGKISAN POS | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 2,292.00 | 116,642,000.00 | Ya |
| 3. Talud | 121.22 | 41,658,000.00 | Ya |
| Total | 164,300,000.00 | ||
| Desa / Kelurahan : TITANG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 50.00 | 5,056,000.00 | Ya |
| 3. Jalan | 543.00 | 24,725,000.00 | Ya |
| 4. Jalan | 58.80 | 2,677,000.00 | Ya |
| 5. Jalan | 86.80 | 3,952,000.00 | Ya |
| 6. Jalan | 78.40 | 3,569,000.00 | Ya |
| 7. Jalan | 131.60 | 5,992,000.00 | Ya |
| 8. Jalan | 89.60 | 4,079,000.00 | Ya |
| 9. Jalan | 414.00 | 19,124,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 705.00 | 24,710,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 352.80 | 12,434,500.00 | Ya |
| 12. Talud | 54.16 | 12,863,000.00 | Ya |
| 13. Talud | 37.45 | 9,610,000.00 | Ya |
| 14. Talud | 58.17 | 14,141,000.00 | Ya |
| 15. Talud | 90.00 | 15,067,500.00 | Ya |
| Total | 164,000,000.00 | ||
| Desa / Kelurahan : WONOBOYO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 1,092.00 | 47,083,000.00 | Ya |
| 3. Jalan | 400.00 | 48,603,400.00 | Ya |
| 4. Jalan | 1,059.50 | 17,681,750.00 | Ya |
| 5. Talud | 60.00 | 24,221,500.00 | Ya |
| 6. Talud | 36.00 | 15,098,850.00 | Ya |
| 7. Talud | 30.00 | 9,340,000.00 | Ya |
| 8. Talud | 60.00 | 7,600,000.00 | Ya |
| 9. Talud | 60.00 | 24,371,500.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : KALIKOTES | |||
| Desa / Kelurahan : GEMBLEGAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 200.00 | 12,000,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 240.00 | 10,000,000.00 | Ya |
| 4. Jalan | 116.00 | 7,000,000.00 | Ya |
| 5. Jalan | 180.00 | 11,000,000.00 | Ya |
| 6. Jalan | 312.50 | 12,000,000.00 | Ya |
| 7. Jalan | 148.00 | 9,000,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 500.00 | 10,000,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 402.00 | 12,000,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 500.00 | 10,000,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 300.00 | 9,000,000.00 | Ya |
| 12. Talud | 20.80 | 8,000,000.00 | Ya |
| 13. Talud | 133.00 | 38,750,000.00 | Ya |
| 14. Talud | 84.00 | 10,000,000.00 | Ya |
| 15. Talud | 36.00 | 12,000,000.00 | Ya |
| 16. Talud | 46.80 | 11,250,000.00 | Ya |
| Total | 188,000,000.00 | ||
| Desa / Kelurahan : JIMBUNG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 2,140.00 | 62,000,000.00 | Ya |
| 3. Talud | 340.00 | 88,000,000.00 | Ya |
| Total | 156,000,000.00 | ||
| Desa / Kelurahan : JOGOSETRAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 197.00 | 15,110,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 30.00 | 1,950,000.00 | Ya |
| 4. Drainase, Selokan, SAH, SAL | 99.00 | 6,490,000.00 | Ya |
| 5. Drainase, Selokan, SAH, SAL | 27.00 | 2,000,000.00 | Ya |
| 6. Drainase, Selokan, SAH, SAL | 64.50 | 5,022,000.00 | Ya |
| 7. Jalan | 342.00 | 16,700,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 540.00 | 16,042,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 102.00 | 3,030,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 594.00 | 17,646,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 204.00 | 6,060,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 272.70 | 8,101,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 587.50 | 17,453,000.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 318.60 | 9,464,000.00 | Ya |
| 15. Jalan - Cor Beton/Blok | 555.00 | 16,487,000.00 | Ya |
| 16. Sanitasi, MCK | 1.00 | 6,445,000.00 | Ya |
| 17. Talud | 59.38 | 17,000,000.00 | Ya |
| 18. Talud | 56.38 | 16,000,000.00 | Ya |
| 19. Talud | 45.88 | 13,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KALIKOTES | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 275.55 | 17,225,000.00 | Ya |
| 3. Jalan | 1,350.00 | 62,152,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 2,875.00 | 85,909,000.00 | Ya |
| 5. Talud | 72.19 | 20,714,000.00 | Ya |
| Total | 192,000,000.00 | ||
| Desa / Kelurahan : KRAJAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 590.00 | 35,631,000.00 | Ya |
| 3. Jalan | 100.00 | 33,523,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 3,244.00 | 104,721,000.00 | Ya |
| 5. Talud | 229.01 | 20,125,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : NGEMPLAK | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 1,530.00 | 42,840,000.00 | Ya |
| 3. Jalan | 3,174.00 | 127,000,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 204.00 | 8,160,000.00 | Ya |
| Total | 184,000,000.00 | ||
| Desa / Kelurahan : TAMBONGWETAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 240.00 | 18,132,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 210.00 | 20,130,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 230.00 | 16,610,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 200.00 | 9,673,000.00 | Ya |
| 6. Jembatan | 1.00 | 21,029,000.00 | Ya |
| 7. Talud | 78.00 | 13,927,000.00 | Ya |
| 8. Talud | 190.00 | 21,708,000.00 | Ya |
| 9. Talud | 300.00 | 17,500,000.00 | Ya |
| 10. Talud | 230.00 | 16,151,000.00 | Ya |
| 11. Talud | 170.00 | 23,402,000.00 | Ya |
| 12. Talud | 240.00 | 15,738,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : KEBONARUM | |||
| Desa / Kelurahan : BASIN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Talud | 146.70 | 42,000,000.00 | Ya |
| Total | 48,000,000.00 | ||
| Desa / Kelurahan : GONDANG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 14.00 | 5,446,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 450.00 | 11,558,500.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 195.00 | 4,965,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 150.00 | 3,844,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 147.50 | 4,173,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 150.00 | 4,200,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 300.00 | 6,727,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 270.00 | 5,766,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 225.00 | 6,424,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 225.00 | 5,302,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 300.00 | 6,727,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 300.00 | 6,727,000.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 180.00 | 5,766,000.00 | Ya |
| 15. Talud | 22.00 | 5,774,300.00 | Ya |
| 16. Talud | 21.00 | 5,567,000.00 | Ya |
| 17. Talud | 17.50 | 4,651,800.00 | Ya |
| 18. Talud | 21.00 | 5,662,000.00 | Ya |
| 19. Talud | 15.40 | 4,310,300.00 | Ya |
| 20. Talud | 735.00 | 19,376,000.00 | Ya |
| 21. Talud | 9.00 | 2,517,500.00 | Ya |
| 22. Talud | 9.00 | 2,466,600.00 | Ya |
| 23. Talud | 30.00 | 8,049,000.00 | Ya |
| Total | 142,000,000.00 | ||
| Desa / Kelurahan : KARANGDUREN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 25.00 | 3,500,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 26.25 | 2,250,000.00 | Ya |
| 4. Jalan | 7,380.00 | 3,500,000.00 | Ya |
| 5. Jalan | 600.00 | 5,000,000.00 | Ya |
| 6. Jalan | 600.00 | 3,500,000.00 | Ya |
| 7. Jalan | 300.00 | 2,250,000.00 | Ya |
| 8. Jalan | 625.00 | 3,500,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 900.00 | 5,600,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 600.00 | 2,100,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 350.00 | 4,000,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 900.00 | 3,500,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 4,500.00 | 5,500,000.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 400.00 | 4,500,000.00 | Ya |
| 15. Jalan - Cor Beton/Blok | 750.00 | 6,000,000.00 | Ya |
| 16. Jembatan | 1.00 | 24,000,000.00 | Ya |
| 17. Talud | 48.00 | 5,800,000.00 | Ya |
| 18. Talud | 96.00 | 3,500,000.00 | Ya |
| 19. Talud | 80.00 | 3,500,000.00 | Ya |
| 20. Talud | 162.00 | 3,500,000.00 | Ya |
| Total | 101,000,000.00 | ||
| Desa / Kelurahan : MALANGJIWAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 200.00 | 29,290,000.00 | Ya |
| 3. Jalan | 1,050.00 | 16,824,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 175.00 | 10,431,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 500.00 | 5,217,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 140.00 | 3,088,750.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 437.50 | 3,722,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 171.50 | 4,211,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 327.00 | 6,047,500.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 600.00 | 24,516,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 90.00 | 2,339,500.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 277.20 | 8,292,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 157.50 | 3,210,850.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 247.50 | 15,428,000.00 | Ya |
| 15. Jalan - Cor Beton/Blok | 143.50 | 2,393,500.00 | Ya |
| 16. Jalan - Cor Beton/Blok | 330.00 | 10,304,000.00 | Ya |
| 17. Jalan - Cor Beton/Blok | 750.00 | 10,341,000.00 | Ya |
| 18. Jalan - Cor Beton/Blok | 112.50 | 2,562,400.00 | Ya |
| 19. Talud | 36.72 | 9,311,000.00 | Ya |
| 20. Talud | 32.76 | 11,401,405.00 | Ya |
| 21. Talud | 23.40 | 3,278,000.00 | Ya |
| 22. Talud | 26.64 | 5,872,770.00 | Ya |
| 23. Talud | 17.28 | 3,918,325.00 | Ya |
| Total | 198,000,000.00 | ||
| Desa / Kelurahan : MENDEN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 3,240.00 | 116,681,300.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 1,599.00 | 54,691,000.00 | Ya |
| 4. Jembatan | 1.00 | 9,232,200.00 | Ya |
| 5. Talud | 56.00 | 13,395,500.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : PLUNENG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 3,800.00 | 152,000,000.00 | Ya |
| 3. Talud | 168.00 | 42,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : NGAWEN | |||
| Desa / Kelurahan : CANDI REJO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 78.00 | 3,500,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 78.00 | 3,500,000.00 | Ya |
| 4. Drainase, Selokan, SAH, SAL | 78.00 | 3,500,000.00 | Ya |
| 5. Drainase, Selokan, SAH, SAL | 90.00 | 3,500,000.00 | Ya |
| 6. Drainase, Selokan, SAH, SAL | 90.00 | 3,500,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 225.00 | 7,500,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 130.00 | 4,950,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 130.00 | 4,950,000.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 15. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 16. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 17. Jalan - Cor Beton/Blok | 164.00 | 6,450,000.00 | Ya |
| 18. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 19. Jalan - Cor Beton/Blok | 130.00 | 4,950,000.00 | Ya |
| 20. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 21. Jalan - Cor Beton/Blok | 130.00 | 4,950,000.00 | Ya |
| 22. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 23. Jalan - Cor Beton/Blok | 164.00 | 6,450,000.00 | Ya |
| 24. Jalan - Cor Beton/Blok | 120.00 | 4,450,000.00 | Ya |
| 25. Jalan - Cor Beton/Blok | 130.00 | 4,950,000.00 | Ya |
| 26. Jembatan | 1.00 | 3,400,000.00 | Ya |
| 27. Jembatan | 1.00 | 3,400,000.00 | Ya |
| 28. Jembatan | 1.00 | 3,400,000.00 | Ya |
| 29. Jembatan | 1.00 | 3,300,000.00 | Ya |
| 30. Sanitasi, MCK | 1.00 | 3,200,000.00 | Ya |
| 31. Sanitasi, MCK | 1.00 | 2,900,000.00 | Ya |
| 32. Sanitasi, MCK | 1.00 | 2,900,000.00 | Ya |
| 33. Sanitasi, MCK | 1.00 | 2,900,000.00 | Ya |
| 34. Sanitasi, MCK | 1.00 | 2,900,000.00 | Ya |
| 35. Talud | 17.10 | 4,400,000.00 | Ya |
| 36. Talud | 17.10 | 4,400,000.00 | Ya |
| 37. Talud | 17.10 | 4,400,000.00 | Ya |
| 38. Talud | 18.00 | 4,500,000.00 | Ya |
| 39. Talud | 17.10 | 4,400,000.00 | Ya |
| 40. Talud | 17.10 | 5,400,000.00 | Ya |
| 41. Talud | 17.10 | 4,400,000.00 | Ya |
| 42. Talud | 17.10 | 4,400,000.00 | Ya |
| 43. Talud | 17.10 | 4,400,000.00 | Ya |
| 44. Talud | 18.00 | 4,500,000.00 | Ya |
| 45. Talud | 17.10 | 4,400,000.00 | Ya |
| 46. Talud | 18.00 | 4,500,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : DRONO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 600.00 | 21,514,500.00 | Ya |
| 3. Jalan | 1,200.00 | 82,810,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 8,400.00 | 89,675,500.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KWAREN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 910.00 | 89,000,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 977.00 | 105,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : MAYUNGAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 2,622.00 | 114,750,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 2,400.00 | 54,000,000.00 | Ya |
| 4. Talud | 101.25 | 25,250,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : PEPE | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 750.00 | 9,375,000.00 | Ya |
| 3. Talud | 890.50 | 184,625,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : PEDAN | |||
| Desa / Kelurahan : BEJI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 900.00 | 29,046,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 660.00 | 21,033,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 525.00 | 16,943,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 900.00 | 29,046,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 450.00 | 14,523,000.00 | Ya |
| 7. Talud | 109.00 | 32,497,000.00 | Ya |
| 8. Talud | 76.00 | 21,832,000.00 | Ya |
| 9. Talud | 93.00 | 27,080,000.00 | Ya |
| Total | 198,000,000.00 | ||
| Desa / Kelurahan : BENDO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Box/Plat Decker | 1.00 | 7,383,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 600.00 | 32,774,000.00 | Ya |
| 4. Drainase, Selokan, SAH, SAL | 200.00 | 10,924,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 900.00 | 12,858,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 180.00 | 10,286,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 750.00 | 21,430,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 300.00 | 11,143,000.00 | Ya |
| 9. Sanitasi, MCK | 1.00 | 6,445,000.00 | Ya |
| 10. Talud | 56.00 | 14,300,000.00 | Ya |
| 11. Talud | 100.00 | 10,328,000.00 | Ya |
| 12. Talud | 300.00 | 34,083,000.00 | Ya |
| 13. Talud | 75.00 | 7,746,000.00 | Ya |
| 14. Talud | 56.00 | 14,300,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : JATIMULYO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 1,755.00 | 12,610,000.00 | Ya |
| 3. Jalan | 90.00 | 5,075,000.00 | Ya |
| 4. Jalan | 300.00 | 29,418,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 337.50 | 10,000,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 420.00 | 12,000,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 1,755.00 | 33,960,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 2,250.00 | 13,000,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 175.00 | 3,000,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 620.00 | 27,000,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 1,225.00 | 32,000,000.00 | Ya |
| 12. Talud | 57.60 | 15,937,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : JETIS WETAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 300.00 | 12,280,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 175.00 | 17,824,000.00 | Ya |
| 4. Drainase, Selokan, SAH, SAL | 200.00 | 6,140,000.00 | Ya |
| 5. Drainase, Selokan, SAH, SAL | 260.00 | 6,140,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 750.00 | 19,606,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 750.00 | 22,280,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 1,080.00 | 22,280,000.00 | Ya |
| 9. Sanitasi, MCK | 1.00 | 11,188,000.00 | Ya |
| 10. Sanitasi, MCK | 1.00 | 5,037,000.00 | Ya |
| 11. Talud | 389.64 | 35,225,000.00 | Ya |
| Total | 164,000,000.00 | ||
| Desa / Kelurahan : KALANGAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Box/Plat Decker | 2.00 | 5,000,000.00 | Ya |
| 3. Box/Plat Decker | 2.00 | 5,600,000.00 | Ya |
| 4. Drainase, Selokan, SAH, SAL | 202.00 | 49,600,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 352.00 | 13,800,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 360.00 | 8,500,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 360.00 | 8,300,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 516.00 | 9,000,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 510.00 | 10,000,000.00 | Ya |
| 10. Talud | 42.66 | 16,500,000.00 | Ya |
| 11. Talud | 20.16 | 9,000,000.00 | Ya |
| 12. Talud | 57.00 | 6,700,000.00 | Ya |
| 13. Talud | 21.60 | 8,000,000.00 | Ya |
| 14. Talud | 54.00 | 12,000,000.00 | Ya |
| 15. Talud | 72.00 | 14,000,000.00 | Ya |
| 16. Talud | 33.48 | 6,000,000.00 | Ya |
| 17. Talud | 49.50 | 12,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KALIGAWE | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 79.00 | 14,460,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 1,660.50 | 64,231,000.00 | Ya |
| 4. Jembatan | 2.00 | 23,018,000.00 | Ya |
| 5. Talud | 202.00 | 78,291,000.00 | Ya |
| Total | 186,000,000.00 | ||
| Desa / Kelurahan : KEDEN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 270.00 | 7,895,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 275.00 | 8,042,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 150.00 | 4,386,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 150.00 | 14,605,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 480.00 | 14,037,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 59.40 | 1,737,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 125.00 | 3,655,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 164.00 | 4,795,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 120.00 | 3,509,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 275.00 | 8,042,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 160.00 | 4,679,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 205.20 | 6,000,000.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 120.00 | 3,509,000.00 | Ya |
| 15. Talud | 14.22 | 4,224,000.00 | Ya |
| 16. Talud | 49.16 | 14,605,000.00 | Ya |
| 17. Talud | 28.44 | 8,449,000.00 | Ya |
| 18. Talud | 28.44 | 8,449,000.00 | Ya |
| 19. Talud | 28.44 | 8,449,000.00 | Ya |
| 20. Talud | 28.44 | 8,449,000.00 | Ya |
| 21. Talud | 48.75 | 14,484,000.00 | Ya |
| Total | 158,000,000.00 | ||
| Desa / Kelurahan : LEMAHIRENG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 68.00 | 4,944,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 270.00 | 19,630,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 330.00 | 9,278,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 444.00 | 14,329,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 147.50 | 4,760,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 390.00 | 10,650,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 271.00 | 13,119,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 579.00 | 18,686,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 297.00 | 12,586,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 250.00 | 6,454,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 297.00 | 9,585,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 785.00 | 18,154,000.00 | Ya |
| 14. Jalan - Cor Beton/Blok | 330.00 | 10,650,000.00 | Ya |
| 15. Jembatan | 1.00 | 1,316,000.00 | Ya |
| 16. Talud | 11.80 | 3,360,000.00 | Ya |
| 17. Talud | 70.88 | 18,831,000.00 | Ya |
| 18. Talud | 70.88 | 12,961,000.00 | Ya |
| 19. Talud | 21.60 | 4,707,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : NGAREN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 100.00 | 14,325,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 375.00 | 19,105,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 90.00 | 4,984,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 220.00 | 14,523,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 400.00 | 27,110,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 300.00 | 25,173,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 385.00 | 25,173,000.00 | Ya |
| 9. Talud | 75.00 | 20,083,000.00 | Ya |
| 10. Talud | 230.00 | 23,441,000.00 | Ya |
| 11. Talud | 175.00 | 20,083,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : SOBAYAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 100.00 | 10,157,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 180.00 | 11,481,000.00 | Ya |
| 4. Drainase, Selokan, SAH, SAL | 160.00 | 10,208,000.00 | Ya |
| 5. Drainase, Selokan, SAH, SAL | 200.00 | 12,757,000.00 | Ya |
| 6. Drainase, Selokan, SAH, SAL | 110.00 | 11,177,000.00 | Ya |
| 7. Drainase, Selokan, SAH, SAL | 12.19 | 9,567,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 44.34 | 13,173,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 40.00 | 11,882,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 54.00 | 10,694,000.00 | Ya |
| 11. Jalan - Cor Beton/Blok | 36.00 | 9,090,000.00 | Ya |
| 12. Jalan - Cor Beton/Blok | 36.00 | 10,694,000.00 | Ya |
| 13. Jalan - Cor Beton/Blok | 30.60 | 16,042,000.00 | Ya |
| 14. Talud | 40.71 | 14,325,000.00 | Ya |
| 15. Talud | 40.70 | 14,193,000.00 | Ya |
| 16. Talud | 16.25 | 14,223,000.00 | Ya |
| 17. Talud | 40.71 | 14,337,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : TAMBAKBOYO | |||
| 1. Bak Kontrol | 1.00 | 2,000,000.00 | Ya |
| 2. BOP | 1.00 | 6,000,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 553.50 | 28,191,000.00 | Ya |
| 4. Jalan | 300.00 | 15,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 1,654.51 | 107,517,000.00 | Ya |
| 6. Talud | 200.00 | 11,600,000.00 | Ya |
| 7. Talud | 457.00 | 27,692,000.00 | Ya |
| Total | 198,000,000.00 | ||
| Desa / Kelurahan : TEMUWANGI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 2,628.00 | 10,000,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 213.00 | 5,000,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 367.50 | 5,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 294.00 | 40,000,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 300.00 | 10,000,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 660.00 | 20,000,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 240.00 | 10,000,000.00 | Ya |
| 9. Jembatan | 1.00 | 20,000,000.00 | Ya |
| 10. Talud | 22.50 | 34,000,000.00 | Ya |
| 11. Talud | 114.00 | 20,000,000.00 | Ya |
| 12. Talud | 22.20 | 10,000,000.00 | Ya |
| 13. Talud | 15.00 | 6,000,000.00 | Ya |
| 14. Talud | 11.28 | 4,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : TROKETON | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 750.00 | 9,900,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 243.00 | 9,450,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 3,250.65 | 78,400,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 180.00 | 4,800,000.00 | Ya |
| 6. Jalan - Cor Beton/Blok | 694.00 | 6,500,000.00 | Ya |
| 7. Jalan - Cor Beton/Blok | 402.65 | 6,650,000.00 | Ya |
| 8. Jalan - Cor Beton/Blok | 278.00 | 5,900,000.00 | Ya |
| 9. Jalan - Cor Beton/Blok | 1,050.00 | 9,900,000.00 | Ya |
| 10. Jalan - Cor Beton/Blok | 266.00 | 7,450,000.00 | Ya |
| 11. Talud | 45.00 | 11,450,000.00 | Ya |
| 12. Talud | 48.00 | 8,000,000.00 | Ya |
| 13. Talud | 40.00 | 11,950,000.00 | Ya |
| 14. Talud | 12.76 | 3,400,000.00 | Ya |
| 15. Talud | 52.00 | 6,500,000.00 | Ya |
| 16. Talud | 37.50 | 4,300,000.00 | Ya |
| 17. Talud | 25.20 | 5,350,000.00 | Ya |
| 18. Talud | 15.17 | 4,100,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kota : KULON PROGO | |||
| Kecamatan : GALUR | |||
| Desa / Kelurahan : BROSOT | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 3,810.00 | 157,080,000.00 | Ya |
| 3. Sanitasi, MCK | 4.00 | 18,000,000.00 | Ya |
| 4. Talud | 1.00 | 4,920,000.00 | Ya |
| Total | 186,000,000.00 | ||
| Kecamatan : LENDAH | |||
| Desa / Kelurahan : JATIREJO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 2,000.00 | 5,000,000.00 | Ya |
| 3. Gorong-Gorong | 1,398.00 | 2,279,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 4,279.00 | 111,131,000.00 | Ya |
| 5. Sanitasi, MCK | 4.00 | 6,230,000.00 | Ya |
| 6. Talud | 425.00 | 69,360,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : SENTOLO | |||
| Desa / Kelurahan : SALAMREJO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 375.00 | 11,370,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 500.00 | 21,485,000.00 | Ya |
| 4. Jalan - Paving Blok | 550.00 | 24,145,000.00 | Ya |
| 5. Sanitasi, MCK | 16.00 | 137,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kota : SLEMAN | |||
| Kecamatan : DEPOK | |||
| Desa / Kelurahan : CATUR TUNGGAL | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 2,000.00 | 138,500,000.00 | Ya |
| 3. Jalan - Paving Blok | 400.00 | 17,500,000.00 | Ya |
| 4. Sumur Resapan, SPAH | 90.00 | 38,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : GAMPING | |||
| Desa / Kelurahan : AMBARKETAWANG | |||
| 1. Jalan | 1,375.00 | 45,687,500.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 379.70 | 44,404,250.00 | Ya |
| 3. Jalan - Paving Blok | 120.00 | 34,980,000.00 | Ya |
| 4. Talud | 231.61 | 44,404,250.00 | Ya |
| 5. Tutup Saluran | 6.00 | 10,524,000.00 | Ya |
| Total | 180,000,000.00 | ||
| Desa / Kelurahan : BALECATUR | |||
| 1. Jalan | 1,800.00 | 180,000,000.00 | Ya |
| 2. Talud | 137.00 | 20,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : BANYURADEN | |||
| 1. Gorong-Gorong | 15.00 | 1,689,800.00 | Ya |
| 2. Jalan | 702.00 | 20,802,780.00 | Ya |
| 3. Jalan - Paving Blok | 4,260.00 | 112,238,400.00 | Ya |
| 4. Talud | 168.00 | 65,269,020.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : NOGOTIRTO | |||
| 1. Jalan | 1,290.00 | 21,000,000.00 | Ya |
| 2. Jalan - Paving Blok | 600.00 | 42,250,000.00 | Ya |
| 3. Jembatan | 1.00 | 15,750,000.00 | Ya |
| 4. Sumur Resapan, SPAH | 27.00 | 27,000,000.00 | Ya |
| 5. Talud | 312.80 | 64,000,000.00 | Ya |
| Total | 170,000,000.00 | ||
| Desa / Kelurahan : TRIHANGGO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Sumur Resapan, SPAH | 194.00 | 194,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : GODEAN | |||
| Desa / Kelurahan : SIDOAGUNG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 336.00 | 51,500,000.00 | Ya |
| 3. Jalan | 3,050.00 | 35,000,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 360.00 | 31,000,000.00 | Ya |
| 5. Jalan - Paving Blok | 1,060.00 | 13,000,000.00 | Ya |
| 6. Talud | 2,352.00 | 63,500,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : SIDOMOYO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Cor Beton/Blok | 810.00 | 63,731,000.00 | Ya |
| 3. Jalan - Paving Blok | 1,390.00 | 17,160,000.00 | Ya |
| 4. Jalan - Sand Sheet | 2,835.00 | 113,109,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : KALASAN | |||
| Desa / Kelurahan : TAMAN MARTANI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 350.00 | 4,000,000.00 | Ya |
| 3. Jalan | 3,000.00 | 145,500,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 6,745.00 | 10,500,000.00 | Ya |
| Total | 166,000,000.00 | ||
| Desa / Kelurahan : TIRTO MARTANI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 4,442.00 | 164,500,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 688.00 | 17,000,000.00 | Ya |
| 4. Jalan - Paving Blok | 244.00 | 12,500,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : MLATI | |||
| Desa / Kelurahan : TIRTOADI | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 800.00 | 43,500,000.00 | Ya |
| 3. Jalan - Cor Beton/Blok | 2,950.00 | 35,000,000.00 | Ya |
| 4. Jalan - Paving Blok | 3,680.00 | 69,000,000.00 | Ya |
| 5. Talud | 1,470.00 | 46,500,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : PRAMBANAN | |||
| Desa / Kelurahan : BOKO HARJO | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Drainase, Selokan, SAH, SAL | 215.00 | 60,300,000.00 | Ya |
| 3. Gorong-Gorong | 4.50 | 3,300,000.00 | Ya |
| 4. Jalan | 600.00 | 71,000,000.00 | Ya |
| 5. Jalan - Cor Beton/Blok | 2,908.00 | 17,100,000.00 | Ya |
| 6. Talud | 244.00 | 42,300,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : SEYEGAN | |||
| Desa / Kelurahan : MARGOAGUNG | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 8.00 | 14,052,700.00 | Ya |
| 3. Jalan - Paving Blok | 2,870.00 | 58,200,000.00 | Ya |
| 4. Jembatan | 2.00 | 57,716,500.00 | Ya |
| 5. Sanitasi, MCK | 2.00 | 21,350,800.00 | Ya |
| 6. Talud | 60.00 | 42,680,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : TURI | |||
| Desa / Kelurahan : DONOKERTO | |||
| 1. Air Bersih, Reservoar, Broncapturing | 12.00 | 40,999,500.00 | Ya |
| 2. BOP | 1.00 | 6,000,000.00 | Ya |
| 3. Instalasi Air Bersih | 5,650.00 | 122,340,500.00 | Ya |
| 4. Jalan - Paving Blok | 1,095.00 | 30,660,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kota : YOGYAKARTA | |||
| Kecamatan : GONDOKUSUMAN | |||
| Desa / Kelurahan : BACIRO | |||
| 1. Instalasi Air Bersih | 450.00 | 161,000,000.00 | Ya |
| 2. Jalan - Paving Blok | 1,789.00 | 26,000,000.00 | Ya |
| 3. Sumur Resapan, SPAH | 4.00 | 13,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : DEMANGAN | |||
| 1. Irigasi | 193.00 | 65,000,000.00 | Ya |
| 2. Jalan | 516.00 | 62,000,000.00 | Ya |
| 3. Jalan - Paving Blok | 427.00 | 39,000,000.00 | Ya |
| 4. Sanitasi, MCK | 1.00 | 28,300,000.00 | Ya |
| 5. Sumur Resapan, SPAH | 1.00 | 5,700,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : GONDOMANAN | |||
| Desa / Kelurahan : PRAWIRODIRJAN | |||
| 1. Jalan - Paving Blok | 1,250.00 | 60,000,000.00 | Ya |
| 2. Sanitasi, MCK | 16.00 | 120,000,000.00 | Ya |
| 3. Sumur Resapan, SPAH | 5.00 | 20,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : KOTAGEDE | |||
| Desa / Kelurahan : PRENGGAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Paving Blok | 4,360.00 | 194,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : PURBAYAN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Gorong-Gorong | 160.00 | 125,500,000.00 | Ya |
| 3. Jalan - Paving Blok | 500.00 | 55,700,000.00 | Ya |
| 4. Sumur Resapan, SPAH | 13.00 | 12,800,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : REJOWINANGUN | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan - Paving Blok | 1,380.00 | 107,128,000.00 | Ya |
| 3. Sumur Resapan, SPAH | 22.00 | 21,149,500.00 | Ya |
| 4. Talud | 178.50 | 65,722,500.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : KRATON | |||
| Desa / Kelurahan : PANEMBAHAN | |||
| 1. Gorong-Gorong | 60.00 | 40,000,000.00 | Ya |
| 2. Jalan - Paving Blok | 1,013.00 | 42,000,000.00 | Ya |
| 3. Sanitasi, MCK | 4.00 | 50,000,000.00 | Ya |
| 4. Sumur Resapan, SPAH | 52.00 | 45,000,000.00 | Ya |
| 5. Sumur Suntik | 1.00 | 23,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : MANTRIJERON | |||
| Desa / Kelurahan : GEDONGKIWO | |||
| 1. Balai Pertemuan | 3.00 | 69,520,000.00 | Ya |
| 2. BOP | 1.00 | 6,000,000.00 | Ya |
| 3. Jalan | 12.30 | 6,080,000.00 | Ya |
| 4. Jalan - Cor Beton/Blok | 1,235.50 | 76,230,000.00 | Ya |
| 5. Sanitasi, MCK | 1.00 | 15,170,000.00 | Ya |
| 6. Talud | 13.50 | 27,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : MANTRIJERON | |||
| 1. BOP | 1.00 | 6,000,000.00 | Ya |
| 2. Jalan | 1,365.00 | 194,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : SURYODININGRATAN | |||
| 1. Balai Pertemuan | 8.00 | 47,062,190.00 | Ya |
| 2. BOP | 1.00 | 6,000,000.00 | Ya |
| 3. Drainase, Selokan, SAH, SAL | 75.00 | 25,882,480.00 | Ya |
| 4. Jalan | 300.00 | 25,424,500.00 | Ya |
| 5. Jalan - Paving Blok | 650.00 | 58,259,480.00 | Ya |
| 6. Jembatan | 1.00 | 10,703,290.00 | Ya |
| 7. Penampung Air Hujan, Embung | 17.00 | 16,521,290.00 | Ya |
| 8. Sanitasi, MCK | 1.00 | 10,146,770.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : MERGANGSAN | |||
| Desa / Kelurahan : BRONTOKUSUMAN | |||
| 1. Balai Pertemuan | 1.00 | 52,228,800.00 | Ya |
| 2. Balai Pertemuan | 1.00 | 53,375,200.00 | Ya |
| 3. BOP | 1.00 | 6,000,000.00 | Ya |
| 4. Gorong-Gorong | 610.00 | 19,567,000.00 | Ya |
| 5. Jalan | 957.00 | 25,232,000.00 | Ya |
| 6. Talud | 176.00 | 43,597,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : KEPARAKAN | |||
| 1. Bak Kontrol | 21.00 | 23,000,000.00 | Ya |
| 2. BOP | 1.00 | 6,000,000.00 | Ya |
| 3. Jalan - Paving Blok | 875.60 | 56,914,000.00 | Ya |
| 4. Other | 51.50 | 11,000,000.00 | Ya |
| 5. Penampung Air Hujan, Embung | 15.00 | 19,500,000.00 | Ya |
| 6. Sanitasi, MCK | 6.00 | 63,311,000.00 | Ya |
| 7. Sumur Resapan, SPAH | 207.00 | 15,525,000.00 | Ya |
| 8. Tutup Saluran | 51.00 | 4,750,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : WIROGUNAN | |||
| 1. Balai Pertemuan | 9.00 | 65,000,000.00 | Ya |
| 2. BOP | 1.00 | 6,000,000.00 | Ya |
| 3. Gorong-Gorong | 424.00 | 57,000,000.00 | Ya |
| 4. Jalan | 477.00 | 51,000,000.00 | Ya |
| 5. Sumur Resapan, SPAH | 11.00 | 21,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : TEGALREJO | |||
| Desa / Kelurahan : TEGALREJO | |||
| 1. Drainase, Selokan, SAH, SAL | 156.30 | 200,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Kecamatan : UMBULHARJO | |||
| Desa / Kelurahan : GIWANGAN | |||
| 1. Drainase, Selokan, SAH, SAL | 500.00 | 200,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : MUJA MUJU | |||
| 1. Balai Pertemuan | 1.00 | 200,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : PANDEYAN | |||
| 1. BOP | 1.00 | 5,129,384.00 | Ya |
| 2. Gorong-Gorong | 334.00 | 71,964,292.00 | Ya |
| 3. Jalan | 1,131.00 | 32,432,226.00 | Ya |
| 4. Jalan - Paving Blok | 795.00 | 60,873,154.00 | Ya |
| 5. Sumur Resapan, SPAH | 34.00 | 29,600,944.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : SEMAKI | |||
| 1. Jalan - Paving Blok | 4,000.00 | 200,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : SOROSUTAN | |||
| 1. BOP | 1.00 | 5,068,605.00 | Ya |
| 2. Instalasi Air Bersih | 232.88 | 106,275,752.00 | Ya |
| 3. Jalan - Paving Blok | 758.50 | 49,655,643.00 | Ya |
| 4. Sumur Resapan, SPAH | 65.00 | 39,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : TAHUNAN | |||
| 1. Gorong-Gorong | 150.00 | 70,000,000.00 | Ya |
| 2. Jalan | 300.00 | 130,000,000.00 | Ya |
| Total | 200,000,000.00 | ||
| Desa / Kelurahan : WARUNGBOTO | |||
| 1. Drainase, Selokan, SAH, SAL | 134.00 | 133,257,000.00 | Ya |
| 2. Jalan | 410.00 | 66,743,000.00 | Ya |
| Total | 200,000,000.00 | ||